Fall Service
Regular fall dock and boat lift service will commence on October 4, 2010.
Click here to learn what you should do to prepare your dock or boat lift
for fall service.
Fall lifting services include:
Docks:
- Removal of decking for winter storage
- Evaluation of all cabling and anchor points
- Flipping of attached “L” sections
- Rigging all lifting components
- Lifting dock from the water
Boat Lifts:
- Dockside to shore placement of boat lift in designated on-site winter storage area
Tracks:
- Removal of track wedges
- Evaluation of all cabling and anchor points
- Rigging all lifting components
- Lifting track from water
Removable Dock Sections:
- Removal of decking for winter storage
- Lifting sections to designated on-site winter storage area